EGNATON study trips are the culmination of learning by example.
We have a compact programme for this:
visit a laboratory building, see the highlights on-site and discuss with those involved in planning, construction and operation.
2024
20 March 2024
Study Tour hosted by EGNATON e.V. and Forschungszentrum Jülich GmbH
Living Lab Energy Campus, Jülich, Germany
CLIENT: Forschungszentrum Jülich GmbH, Germany
You have found an interesting object that might be suitable for a study tour? Then please use this informative document, fill it out, and send it to us. Thank you very much!
A selection of our previous Study Tours
2021
8 November 2021
Virtual Study Tour hosted by EGNATON
2018 UC BIOTECH
Biocant R&D biotechnology park, Cantanhede, Portugal
CLIENT: UC Biotech
16 August 2021
Virtual Study Tour hosted by hammeskrause and EGNATON
The RICS Building - Roche Innovation Center Shanghai
Roche, Shanghai, China
CLIENT: F. Hoffmann La Roche AG
19 July 2021
Virtual Study Tour hosted by Carpus + Partner AG and EGNATON
Merck E65 Performance Research Center
Darmstadt
CLIENT: Merck Group, Darmstadt
8 March 2021
Virtual Study Tour hosted by KUL and EGNATON
O & N5
O & N1 bis
Quadrivium
Katholieke Universiteit Leuven (KUL)
CLIENT: Katholieke Universiteit Leuven (KUL)
2020
7 October 2020
Virtual Study Tour hosted by HDR and EGNATON
FRANKFURT CANCER INSTITUTE FCI
GOETHE-UNIVERSITÄT FRANKFURT
CANCER RESEARCH CENTER
CLIENT: GOETHE-UNIVERSITÄT FRANKFURT
GFA: 318,316 sq ft
CONSTRUCTION COST: 42.0 M EURO GROSS
DATES: 2019 – 2023
WORKING STAGES: 1-8
18 June 2020
Virtual Study Tour hosted by EGNATON
ALLIES AND MORRISON with Buro Happold and Abell Nepp Architects
The Michael Uren Biomedical Engineering Research Hub
London, UK
CLIENT: IMPERIAL COLLEGE LONDON
Size: 18.150 sqm (GIFA)
CONSTRUCTION COST: unknown
DATES: 2014 – 2020
BREEAM VERY GOOD TARGETED
10 March 2020
Virtual Study Tour hosted by University of Heidelberg and EGNATON
University of Heidelberg, Neuenheimer Feld, Heidelberg
CLIENT: University of Heidelberg
CONSTRUCTION COST: unknown
DATES: 2016 – 2018
2019
19 November 2019
Study Tour hosted by FHNW and EGNATON
FHNW Campus Muttenz
Fachhochschule Nordwestschweiz FHNW
CLIENT: Fachhochschule Nordwestschweiz FHNW
CONSTRUCTION COST: unknown
DATES: – 2018
The new building offers from 2018 new space for training and further education of the five universities. So far the faculties spread over several locations. ln the campus buildings school Iabs and office space are accommodatecl, which are flexible and therefore changing needs in teaching and research Iet adjust.
The university operates in the cutting edge of biology, medicine, natural and engineering sciences. Especial/y it is about the implementation and development of processes in the broadest sense of human health and sustainable production in the life sciences sector.
The Iabaratory concept has modem Iabaratory standarris consistently implemented, based on an optimal functioning open space Iabaratory layout.
or
12 September 2019
Study Tour hosted by KIT and EGNATON
Materialwissenschaftliches Zentrum für Energiesysteme (MZE)
Karlsruhe Institute of Technology (KIT)
CLIENT: Karlsruhe Institute of Technology (KIT)
CONSTRUCTION COST: € 27.4 million
DATES: – 30.06.2016
28 May 2019
Study Tour hosted by Johnson & Johnson and EGNATON
Project LION (Labs-in_One-Network")
Janssen Pharmaceutica NV, Beerse, Belgium
CLIENT:
Johnson & Johnson
2018
28 June 2018
Study Tour hosted by Ghent University and EGNATON
Renovating a Laboratory Building
Life Science Faculties of Ghent University
CLIENT: Ghent University
CONSTRUCTION COST: unknown
DATES: 2010 - 2019
16 May 2018
Study Tour hosted by Roche and EGNATON
Roche Diagnostics GmbH
Roche Deutschland, Penzberg
CLIENT: Roche Holding AG
CONSTRUCTION COST: unknown
DATES: continuous adaptation
2017
12 December 2017
Study Tour hosted by Meyer Werft and EGNATON
Meyer Werft Papenburg
Meyer Gruppe,
CLIENT: MEYER WERFT GmbH & Co. KG
CONSTRUCTION COST: unknown
DATES: continuous adaptation
8 November 2017
Study Tour hosted by Goethe University and EGNATON
Biologicum
Goethe University, Frankfurt
CLIENT: Goethe University, Frankfurt
CONSTRUCTION COST: unknown
DATES: - 2017
7 February 2017
Study Tour hosted by DZNE and EGNATON
Laborgebäude DZNE
Deutsches Zentrum für Neurodegenerative Erkrankungen e. V. (DZNE)
CLIENT: DZNE, Venusberg-Campus, Bonn
CONSTRUCTION COST: unknown
DATES: - 2017
2016
22 November 2016
Study Tour hosted by KUL and EGNATON
Building a L3+-cluster on top of a lab building in construction
Rega institute, Katholieke Universiteit Leuven (KUL)
CLIENT: KUL
CONSTRUCTION COST: unknown
DATES: - 2016
25 October 2016
Study Tour hosted by Roche and EGNATON
Labs Q2K and MLK in Kaiseraugst
Roche Holding AG, Basel
CLIENT: Roche Holding AG
CONSTRUCTION COST: unknown
DATES: 2014 - 2016
Others
Imprint
Privacy
Contact
Download Members only
Copyright © 2024 EGNATON e.V. Im Eichenböhl, D-64625 Bensheim/Germany +49 2153 9098 941
View background
Laboratories change dynamically, partly continuously, and partly disruptively.
EGNATON strives for sustainable answers to emergent changes.
EGNATON's goal is to create international leadership for sustainable German-European laboratory technologies.
Do you want to become a member? --> Statutes of the Association --> Original statutes (in German) --> Scale of fees --> Logo Guidlines --> Membership application form